Lloyd Farm Is Only “Doing The Wrong Thing Better” And Should Be Voted Down

One of Canada’s leading urban planners, Brent Toderian, shares this slide with communities he consults in to spur discussion:

As the Carrboro Board of Aldermen contemplate the Lloyd Farm proposal Tuesday evening (10/23), they should know that they are clearly dealing with a case of Doing The Wrong Thing “Better.”

Despite years of discussion, the principal flaws of the Lloyd Farm proposal remain the same.

A Missed Economic Opportunity

We need to maximize our tax value per acre on parcels in Carrboro to better balance our commercial and residential tax base, and that means building up in a denser format. An urban grid with rectangular or square blocks makes redevelopment much easier in the long run.

Instead, Lloyd Farm gives us the limited value proposition of the Timberlyne Shopping Center and its strip mall-plus-outparcel format. Joe Minicozzi from Urban Three found that suburban Timberlyne produces a tax value of about $950,000 per acre while the taller, urban format Hampton Inn in downtown Carrboro produces over $33 million per acre.

A Missed Design Opportunity

The two most damaging design features of this proposal are the curvilinear road running through the site, and the poorly placed stormwater ponds that will make creating urban blocks on the site financially challenging or impossible for future redevelopers.

One needs only to view Durham’s Patterson Place in Google Maps to see how a suburban site can be laid out in a grid-like fashion to be infilled later. Twenty years after it was first developed, the Durham Planning department is doing exactly that, and a five-story Duke Medical office building and a Springhill Suites hotel are the first signs of a new, more vertical, higher tax-base per acre urban future at Patterson Place.

A Missed Housing Opportunity

Carrboro will not address its housing cost challenges without building significantly more new units, many of which could be built on such a large site. It’s also disappointing to see only senior housing being proposed. While there are housing needs for senior citizens in Carrboro, it is worth noting that older Americans are generally wealthier than everyone else.

Median Net Worth By Age

Furthermore, the Town’s economic analysis indicates that the vast majority of the jobs expected to locate at Lloyd Farm will earn less than $15/hour, and are professions that are generally held by younger people. This proposal could have contained a significant number of micro-units in the 400 to 600 square foot size range so that people who worked at Lloyd Farm could live there, too, and walk to work- helping us be more inclusive in our housing while also reducing traffic.

So Where’s The Better?

The developer has made some changes to the original proposal. Getting buildings on the north side of the grocery store parking field may help that part of the site transform one day, and the addition of more floors of office space is better than those remaining one story buildings.

But while there is also a public gathering space/amphitheater designated, it does not have a real connection to the uses that would help activate it- the restaurants and retail. Instead, it is closest to the parking lot of an office building, and separated from those potentially synergistic uses by the beating heart of this proposal- the massive parking field for the grocery store.

Years of discussions have not changed the fact that the developer is basically following the punch list of a chain grocery store for their preferred suburban layout, where they work from the assumption that everyone always drives to the store, and that there’s no need to push back against that norm to do something better. This is the wrong thing to do in the 21st century.

Carrboro cares about equity, works hard to make transportation choices possible, worries about how to grow the commercial tax base, and proclaims a desire to make a difference in a world where the IPCC just told us we have about 12 years to turn the tide on climate change.

Carrboro can do so much better, and it should. The Aldermen should reject this proposal and immediately get to work on a comprehensive plan to help guide developers toward those better outcomes. If you agree, shoot an email to boa@townofcarrboro.org and let the Aldermen know.

Meetings on The 203 Project – Library & ArtsCenter Space – TODAY!

The 203 Project

Just a quick note to everyone this morning- the Town of Carrboro has been pushing the word out that there are not one but TWO meetings being held TODAY, August 4th, to collect public input on The 203 Project – which will be the future home to the Orange County Southern Library branch, Town Parks & Rec offices, WCOM Radio, offices for The ArtsCenter and more.

If you’re a parent, I’d particularly encourage you to come and bring kids. The first meeting we went to (scheduled during bedtime for most families) was largely age 50 and up, and Carrboro is a much younger town demographically.

Here are the meeting times and locations:

August 4, 2018
Carrboro Town Hall
301 West Main St., Carrboro NC
12-2pm

August 4, 2018
Oasis of Love Tabernacle of Faith
8005 Rogers Rd, Chapel Hill, NC 27516
4-6pm

Here are some of the things I’ll be sharing if I can make it to one of the meetings today:

  1. The 203 Project needs to focus on the needs of the building program first, and how to get to the building by bike, bus, and foot second, and parking access third. Downtown Carrboro has over 2,000 empty parking spaces at any given time and this project cannot free up more of them; only town leadership at a downtown-wide level can do that.
  2. We have a small downtown with limited land available for economic development. While there is a terrific set of uses proposed for this building, we should also be seeking economic development at this site. Making the building taller, up to 5 stories- would allow for small company startup space on the upper floors. Some of the Alderfolks have talked about having “Affordable office space” for micro-businesses in town, and this building is a great place to do it. I’d like to see if we could get at least 5,000 – 10,000 square feet of such space into the building.
  3. The ground floor should have a strong orientation to the sidewalks on S Greensboro St and Roberson to embrace what we hope will be very lively pedestrian spaces.

 

Hopefully some of you can get to one of these!

Chapel Hill Transit Proposes New System Maps – Scenario 3 Is The Best

The bottom line: in the past week or so, Chapel Hill Transit has released three potential service scenarios that could inform the transit service we have in the fall of 2019.  Scenario 3 is a major, positive game-changer. The new service concept in Scenario 3 will make it easier for people to use transit for types of trips in Chapel Hill and Carrboro that were not previously possible, while also giving lots of people access to jobs 7 days/week instead of only 5 days/week. This can drive ridership, making positive impacts for equity and helping to slow or mitigate climate change.

But first, here’s the most important map made by the consultant, Nelson Nygaard: CHT Ridership by Stop

This map shows ridership by the size of the circle at each bus stop. Bigger circles = more riders.Within the massive pile of circles on campus, the U, RU, and other campus routes do a lot of business because it is so hard to park at UNC. Whenever you wonder why the consultant might have recommended something, return to this map.

Below is a map of Scenario 3.

Scenario 3

CHT Scenario 3 System Map_V3-01

Scenario 3 Notes:

This is the “Start from Scratch” map where the consults tried to be maximally responsive to where ridership activity is. These routes look quite different from what we have today, and there are some strange bends in the routes here and there. But look closely- you’ll see that the six core routes: EW, J, T, NS, V, and U -do something really compelling. You can make direct transfers from each route to each of the other routes somewhere in one of the two towns or on campus!

CHT As a One-Connection Network

That means you can make ALMOST any trip on these routes with only one transfer. Let’s watch how this works in practice:

  • Live Along the V? Catch the T at Glen Lennox, J, NS, T & U on South Columbia St. Connect to EW at Franklin/Columbia corner, of catch EW again at Carrboro Plaza.
  • Live Along the T? Catch the NS on MLK Blvd or downtown, Catch the EW downtown or near Rams Plaza, catch the V in Northside or at Glen Lennox, catch the U or J on South Columbia St.

The Washington Metrorail system is designed like this. While there are sometimes ways to make trips faster with 2 connections, you can get from pretty much any station on any Metrorail line to any other with one connection if that’s what you prefer.

The EW Route is the Most Needed Route We Are Missing Today

We have had a solid North-South route in Chapel Hill for a long time, the NS. What we’ve been dealing with in pieces across the F, J, CW, D, CL, are all the major East-West movements in town. The EW route is a true game-changer. As the parent of elementary schooler, a bus like EW running from 6:30 AM to 11:30 PM is going to provide great freedom to DC as he gets older. Using ONE bus you could go to the following places on the EW:

  • University Lake
  • Carrboro Plaza
  • Johnny’s
  • Carrboro Farmers Market
  • PTA Thrift Shop
  • Downtown Carrboro
  • ArtsCenter
  • Downtown Chapel Hill
  • Caffe Driade
  • Bolin Creek Greenway (bike on bus!)
  • University Place
  • Rams Plaza
  • New Hope Commons
  • Patterson Place

That’s a lot of freedom! And a lot of places to work. With connections to NS, V, and T, pretty much every commercial center in Chapel Hill and Carrboro is within reach.

Is There Anything I Would Change About Scenario 3?

I have one major quibble with this otherwise really exciting concept- the J route. It has not been adjusted. And what this means is that we continue to have a situation where we have a high density, lower-car ownership area south of town near Carrboro High School and Rock Creek Apartments- that cannot take a bus easily to downtown Carrboro or Chapel Hill for work. The J brings residents from that neighborhood to the bottom of South Greensboro Street, less than 1 minute by bus from downtown…and takes them on long trip on NC 54 through campus before reaching Franklin St and Main St.

It seems like the primary roadblock to doing something like this is making sure CHT can continue to serve the significant ridership east of Greensboro St and west of South Columbia along NC 54. I see two ways to address this.

  1. Turn the JFX into a non-express route to provide additional service to those apartment complexes on weekdays, and move the J off of this stretch of NC 54, sending it north from Rock Creek to downtown Carrboro and then Chapel Hill instead. This helps those apartments during weekday peak hours, but would leave them with no weekend or evening service.
  2. If it is important to provide those apartments all-day service, and it seems to be, what about modifying the J to run like this?
Modified J Route- No Crazier than the Current Version!

Here’s how the modified J would work.

Bus 1 departs Rock Creek Apts following the Green pattern, proceeding first to downtown Carrboro, then turning RIGHT towards Chapel Hill. When it reaches South Columbia Street by the Skipper Bowles building it follows the purple line south to Fordham Blvd /15-501 and then takes that path back to Rock Creek Apts.

Bus 2 departs Rock Creek Apts following the Purple pattern, proceeding first to downtown Carrboro, then turning LEFT towards Collins Crossing/Davie Rd. When it reaches Frat Court by the Ackland Art Museum, it picks up the Green line north to Franklin St, then west to downtown Carrboro and back to Rock Creek Apts via South Greensboro St.

What are the benefits of this change?

  • Every part of the J route now has bi-directional service. No more one-way loop on Jones Ferry Rd, NC 54, and South Greensboro. That’s good! Jarrett Walker, author of Human Transit, has laid down the definitive explanation of why one-way loops are not good for transit here.
  • People boarding the J who previously could go straight to Chapel Hill along Main/Franklin will need to transfer to the EW at the Club Nova bus stop between to make the same trip. But the EW is pretty frequent at every 15 minutes. If CHT schedules the eastbound modified J buses from Collins Crossing to South Greensboro St to pass Club Nova 5 minutes ahead of the EW in the morning, and 5 minutes later westbound in the evening, this will work out smoothly for passengers. Also- now that the J runs along 54 without getting off, riding the OPPOSITE direction from Collins Crossing/Davie Rd probably gets them to south campus FASTER, even if they make stops along NC 54. There’s also the GoTriangle 405 at the same stop.
  • People who used to ride from Rock Creek to campus via NC 54 have had their trips lengthened a bit, but now they have access to both downtowns for work or social opportunities that they can connect to before or after going to campus or on weekends. If they accidentally catch the bus that is going towards Collins Crossing once it reaches downtown Carrboro, they just hop off and catch the EW, or stay on the J and enjoy the ride.
  • Businesses in downtown Carrboro and Chapel Hill who face parking challenges for workers and customers should benefit from this move. It makes the J work as well for the two downtowns as it does for the UNC campus.

Overall, moving to something like Scenario 3 is going to be a significant change in how people use the system. It’s impossible to make these types of changes without some folks losing the service they have today, but we also have to think about how the service improvements in this scenario could potentially make the service useful for more people than currently find the service useful today. I chose to live where I live today in part because it was a certain number of feet from a CW bus stop. Scenario 3 takes that stop away from me, and makes me walk farther to catch a bus in the first place. But the type of service I can walk to will be DRASTICALLY more useful, and I want that kind of service because my family will ride it much more often. I’m betting others will too.

#TeamScenario3

Okay, that’s my take. What’s yours? Leave a comment!

And more importantly, head over to the Chapel Hill Transit Survey and leave your suggestions there!

Development at 203 S Greensboro Needs Less Parking, More Startup Space to Complement Library

On September 19, the Carrboro Board of Aldermen will be discussing a proposal to redevelop 203 S. Greensboro St into the Southern Orange County library and several other public uses for Town of Carrboro departments.The current plan significantly over-provides parking and under-supplies useful commercial space in a downtown whose own recent parking study found that there are over 1,280 unused parking spaces in downtown Carrboro (click here, see page 9 of PDF) at virtually all times of day, 365 days a year.

Before moving forward with this plan, the Board of Aldermen should modify the project as follows:

  1. Reduce the overall parking program to 150 spaces, using only the below ground and 1st levels for parking.
  2. Add a minimum of 8,400 square feet to the project on the upper floors that would be leased to private, taxpaying uses
  3. Explore if building more sq footage brings cost per square foot down, especially if building full, flat floors across floors three and four
  4. Pursue a partnership with American Underground to fill some of the space with startups, and/or use a commercial broker to lease the space
  5. Allocate the 150 parking spaces as follows:
    1. 20 spaces for use by Town (all departments combined)
    2. 130 public spaces (can be used by library patrons, artscenter, town workers, etc as long as they follow parking rules)
  6. Price the parking in the deck to keep 15% of public spaces free at all times, adjusting the price by time of day according to demand. If the deck can have 15% of spaces free without charging at some time of day, parking should be free in that time period.

Why The Aldermen Should Take These Steps

Let’s unpack these moves one by one.

1. Reduce parking to 150 spaces. Here’s the ground floor of the proposed building. South Greensboro Street is to the left, Open Eye Cafe is be directly above the building.  The ground floor of our new signature Town building would be a 14,000-odd square foot library and 19,000 or so square feet of parking. As you go up, the pattern remains this way- about 33,000 sq feet of development of which 58% is parking and 42% is everything else. The below ground floor is 80% parking. This is just too much. If you look at the total program proposed, it comes out to 5.4 spaces per 1000 gross square feet (GSF) of building. To put this in perspective, malls and big box stores generally provide 4 spaces per 1000 GSF.  After the administration in Washington signaled its intent to pull out of the Paris Climate accords, Carrboro put green lights up on Town Hall to signal its commitment to climate action. If we are going to build more parking for our public buildings than Southpoint Mall builds for its shoppers, then I would suggest we take those green lights down and stop pretending we’re committed to fighting climate change. A lot of communities don’t even have parking requirements downtown anymore (i.e. Durham) because they are working to help people use more sustainable travel modes by not subsidizing auto usage.

Library Parking Ground Floor

14,390 square ft of Library, 19,000 square feet of parking!

2. If we took out two levels of the parking deck, according to the cost per square foot and cost per space of parking for the Town in the June 20th presentation, we could add 8,400 square feet of space and pay the same amount to build the building as if we built 55,000 square feet and two more levels of parking. However, we would have more space to lease that would hopefully bring a return on investment to the Town over the years.

3. The cost of this building is projected at $250 per square foot. I am not sure if this is high, but the irregular shape of each floor to wrap around the parking deck may be driving the cost up. The Board should seek advice from Jim Spencer, the architect, on whether having more conventional floor plates on the third and fourth floor in lieu of parking would bring the overall cost per square foot down. If so, then the Town could consider even more square footage that could be rented to the private sector.

4. Pursue a partnership with American Underground. For those who don’t know, American Underground is the wildly successful startup incubator in the basement of the American Tobacco Campus in Durham which has since expanded to two more buildings in Durham and one location in Raleigh. Now that Carrboro has direct bus connections to Durham with stop one block from 203 S Greensboro and one block from American Underground(AU), it’s a great time to leverage a lot of the common cultural affinity between Carrboro and Durham and see if AU is interested in establishing a “Western Outpost” for their ecosystem in Carrboro. We may be able to offer less costly expansion than the increasingly expensive office space market in Downtown Durham, while still offering many of the amenities that both downtowns share.

5. Allocate the 150 spaces as follows: 10 for town employees, 140 public spaces. The current proposal has 30 spaces for Parks and Rec. If the Town wants to get businesses in downtown Carrboro to get their employees to stop using up public parking that visitors and customers could use, they should lead by example. Last year, a delegation from Chapel Hill and Carrboro visited a very successful mixed use project in Boulder, Colorado that had multiple users using one parking garage called Boulder Junction.

Boulder Junction in Boulder, CO has its parking Shared, Managed, Unbundled and Paid

Boulder Junction’s parking operates on four principles: it is shared, managed, unbundled, and paid. “Shared” means that any person can use any space; there’s no “parking for XYZ business only” signage. “Managed” means that there is a strategy for how the parking is to be used, and an entity providing policy and enforcement to ensure the strategy is carried out. (in this case, the city of Boulder) “Unbundled” means that if you rent space in the building, you are not automatically allocated a parking space- you must also rent spaces individually as well, whether you rent by the hour, day, week, or month.  Finally, “paid” is relatively obvious. While the Carrboro Parking Study’s chief failure is no mention of the word pricing, the Town actually went ahead and priced the Rosemary Street lot by Carrburritos and Bowbarr recently, so we’ve crossed the Rubicon and now charge for parking in Carrboro. So let’s do it right. Let’s start where we are as a Town, and implement a system that lets the first 2 hours (or 3! or 4! or whatever we decide!) be free, and only thereafter charges the user. This system is deployed in the North Deck at the American Tobacco Campus in Durham, and people can pay using the Parkmobile app. It’s convenient, promotes turnover, prevents park and ride in inappropriate places, and allows for parking to be free as long as it makes sense.

Taking these four principles, a purist approach would put all 150 spaces into this system. But the Town has storage for some departments in the basement, and there are probably some needs for moving equipment in and out of the building for key events that should have those spaces reserved for town staff. But ten spaces should be enough.

Beyond those ten spaces, the Town should be encouraging downtown employees to park on fringe lots and either walking, biking, or busing to the core sites downtown (203 S Greensboro and the Century Center).

On page 20 of the parking study, you can see that VHB documented 151 cars parking for over 7 hours in our “2-hour stay” public lots. VHB estimates that 50 to 60 of these are town employees, and another 90 to 95 belonged to other downtown employees or UNC students stealth park-and-riding to campus.

I’m sure town employees who currently enjoying parking downtown may be disappointed with this recommendation. But hopefully they recognize that if they can park a little further away, they can support vitality for downtown businesses, and get a few more steps in to finish their commutes, or snag a CHT bus from a lot a little further away.

6. Price the deck for 85% occupancy. This is considered a best practice in the parking industry. If you set the price so that 15% of spaces are empty, then you can pretty much guarantee that with people coming and going, you will ALWAYS find a space at your destination. No more circling and hunting for a space. If demand for spaces is such that 15% of spaces are empty even if the price is free, then that’s what you charge – $0. Based on the Carrboro Parking Survey, it appears weekday lunch hours represent the greatest crunch given our current conditions. In this case, the parking at 203 S Greensboro might have a charge at lunchtime, but not earlier or later in the day. We’d have to set up the system and see. That said, once the system is up and running, businesses could opt in, just as they did in Asheville.

If you take these steps together, and only add the 8,400 square feet while reducing to 150 spaces, you still get a parking ratio of 2.4 spaces per 1000 square feet, which is higher than many downtowns like Carrboro require today. That’s a reasonable outcome to transition downtown away from auto dependence and towards greater economic vitality, while also delivering needed Town office space and the library everyone wants to see happen.

It’s time to do parking pricing right, on the Town’s terms, in a strategic way that balances our goals and puts us on a path to unlock the 1,280 spaces that are tied up in 140+ individual lots, while raising money for alternative modes. This worthy project is the place to start that new effort.

If you agree, please let the board know by emailing boa@townofcarrboro.org.

Carrboro Needs a Comprehensive Plan, and The Aldermen Should Put Money in the Next Budget To Create One

Carrboro needs a new Comprehensive Plan, and an entirely new Unified Development Ordinance. The Carrboro Board of Aldermen should take the first step towards these goals by putting money in the town’s Fiscal Year 2018 budget to create such a plan.

Last year, my most widely read posts on CityBeautiful21 were about one subject- the proposed Lloyd Farm development, a crappy 20th century strip mall concept that greatly underused the site and missed the mark in many ways. I’m not going to rehash the problems with the proposal, but anyone who wants a rundown can read my final piece before the vote here.

Instead, I’m going to discuss the two things that Carrboro lacks that likely would have prevented the Town from taking FIVE YEARS to reject a bad idea.

Those two things are:

  • A lack of a Current Comprehensive Plan or Vision document with appropriate geographic specificity
  • An outdated and piecemeal-amended Unified Development Ordinance that draws its core values from the ideas of the late 1970s, that does not reflect the challenges and opportunities present in Carrboro today.

 

Quick Review: What’s A Comprehensive Plan? What’s a Unified Development Ordinance?

Simply put, a Comprehensive Plan is an overall policy document for a city or town that describes the type of community the city or town seeks to become in the future. A Comprehensive Plan usually has many subsections with goals for each including items such as Land Use, Transportation, Economic Development, Parks and Recreation, Social Equity, Environmental Quality, and so forth. Truly excellent plans try to address the places where goals for each of these topics may conflict and accurately frame the tradeoffs inherent in those conflicts.

A Unified Development Ordinance is the nitty-gritty, detailed set of rules and regulations that govern how buildings, streets, sidewalks, telephone poles, plantings, trash bins and just about any other physical element of the community you can think of gets laid out on the ground when it is built.

Lack of a Current Comprehensive Plan or Vision Document

It is worth nothing that while the town does not have a Comprehensive Plan, Carrboro does have a Vision document, called “Carrboro Vision 2020.” It was adopted quite a while back, in 2000, and it is a vision for the whole town. Some of the policies are quite good. Here are a few:

2.22 Where development is deemed acceptable, there should be well defined dense
development with areas of well preserved open space.

Another:

2.41 The town should support the evolution of a downtown district that embodies
Carrboro’s character. The downtown district should have medium-rise buildings
appropriately sited with adequate public access, and it should provide shopping
opportunities that meet our citizens’ everyday needs. The downtown should
remain a center for the community where people work, gather, shop, socialize and
recreate. The Century Center should serve as a focal point for the downtown.

And another:

4.41 As a general policy, established roads should be widened to accommodate bike
lanes and sidewalks, but not to provide additional lanes for automobiles.

It is terrific that Carrboro has a policy document like this, and the 300 East Main development in downtown is evidence that this policy is being applied in at least part of downtown. But while it is great that we have such straightforward, intentional statements for downtown, it is clear that “well defined dense development” is nearly the opposite of what we got at Lloyd Farm.

An Outdated Unified Development Ordinance (UDO)

Generally speaking, if you want to build something that positively adds to the town’s urbanity, amplifying the “life-on-foot” feel that makes downtown Carrboro such a great place, you need to jump through all sorts of hoops, extra public hearings and special use permits to get it built. When you want to build something that turns inward, away from the street, and doesn’t contribute much to the public realm in Carrboro, you can usually get a building permit pretty quickly under our 1970s suburban ordinances. Under these conditions, you’re counting on the quality of the vision of the developer to give you something other than a terrible outcome.

While once in a blue moon we get a solid outcome like Shelton Station, we usually get an urban failure like the Park Slope development. What’s wrong with Park Slope? Several things, but the worst thing about it is that the Town did code not require Park Slope to build a piece of sidewalk on South Greensboro St along the front of the Park Slope property.

No Sidewalks At Park Slope

No Sidewalks At Park Slope (right side, with little red signs on white posts) on S Greensboro St

What’s particularly sad about this outcome is that residents have been advocating for several years to get a sidewalk on South Greensboro Street. If the Town had required a sidewalk here, and the new South Green development had been required to build more sidewalk to connect to it, the Town would be much closer to having a sidewalk from downtown to the base of the South Greensboro, and the private sector would have been a partner in helping to make that connection.

Instead, the town is having to compete with Durham, Chapel Hill, and Hillsborough for limited Congestion Mitigation and Air Quality (CMAQ) funds at the DCHC-MPO to build a sidewalk for $400,000.  Carrboro should be getting developers to participate in building our sidewalks on major arterials, so that we can request CMAQ funds for things that are greatly needed but unlikely to be funded by developers, like future phases of the Morgan Creek and Bolin Creek Greenways.

So why exactly didn’t the code require sidewalks here? It’s not entirely clear to me, but the reason may be in Article XIV (the Streets and Sidewalks section) of Carrboro’s current UDO.

In subdivision developments that abut a public street, sidewalks shall be con-
structed adjacent to such street if a sidewalk in that location is required by the officially adopted town sidewalk master plan. Whenever possible, such sidewalk shall be constructed within the public right-of-way.

I put a few words in bold above. Carrboro does have an adopted Bike Plan on their website, but I did some Googling and Carrboro does not seem to have an officially adopted sidewalk master plan. That seems to be a big hole weakening the connection between what we want to happen and our requirements to deliver our desired future.

There’s also some text in other parts of Article XIV that states:

The permit-issuing authority may reduce the sidewalk requirement for subcollector streets
meeting the alternative street standard from both sides to one side of the road if:
a. The development contains a parallel system that is integrally designed and provides pedestrian access to the interior of the site;

This is great for the people who live in Park Slope, but not good for anyone who doesn’t live there but needs to walk by Park Slope. It’s also very consistent with the idea that paths are for walking within developments, and presumes you will never need to walk out of the development because you will drive to anywhere else- a very 1970s view of the world.

Our Regulations Aren’t Working For Us (Or For The Developers)

With five years to get to “No” on Lloyd Farm, and missing the chance to have developers build sidewalks on a street where we ARE approving development and are applying for public funds to build sidewalks, it’s clear that our directions to the development community aren’t clear enough about our desires and our ordinances aren’t organized to require the pieces of town infrastructure we need.

If Carrboro doesn’t change its approach to development proposals, what happened with Lloyd Farm will happen again, and what happened with Park Slope will happen again.

Our ordinance is full of band-aids with amendments in 1998 or 2003 still trying to address thoughts from the 1970s and the 1980s in 2017. The world has changed, our towns opportunities and challenges have changed, and so should our development regulations to be more specific about the future our town needs and desires. It’s time to throw the old stuff out and start fresh. Want to see what a modern UDO looks like? Check out Raleigh’s – complete with pictures to make it easy to understand for residents.

From the point of view of the development community, I’m sure they would like to propose projects that generate less fractious debate and have a better chance of being well-received by residents. A clearer code could be a win-win where Carrboro residents see more changes in town that complement their vision for the future, and developers can approach projects with more certainty about outcomes.

What The Aldermen Should Do

On January 24th at 7:30 pm, there is a public hearing on budget priorities for the upcoming year. I’m requesting that the Aldermen put in funding to hire a consultant to support the Town Planning staff in developing a new Comprehensive Plan for Carrboro and a completely brand-new UDO. Please join me in making this request. You can attend in person, or tell the Aldermen “We Need a Comprehensive Plan!” by emailing boa@townofcarrboro.org.

At Busiest Time of Day, Downtown Carrboro Has Over 2,000 EMPTY Parking Spaces

Yes, you read that right. There are usually 2,000 (or more!) parking spaces empty at all times in downtown Carrboro. But we don’t have a way to allow private businesses to partner seamlessly with each other and the town to make these spaces available to the public in a way that balances individual lot owner goals and overall access goals for the downtown, so these spaces go unused when they could be more full.

Until we figure out how to address this untapped parking capacity for the benefit of business owners, the Town, and residents, there is absolutely no reason to build another parking space with public money in downtown Carrboro. It represents a massive opportunity “hiding” in plain sight.

In February, the consulting firm hired by the town to conduct the parking study, VHB, reported the following:

  • The Town of Carrboro owns 359 public parking spaces in 3 lots
  • The Town of Carrboro leases 356 public parking spaces in 5 lots
  • Private Property owners control 3,333 private parking spaces in 145 lots
  • Total Downtown Parking = 4,048 parking spaces
  •  Carrboro’s parking supply is 82% private spaces and 18% public spaces

 

Lunch Time is Crunch Time

VHB conducted parking counts and determined that peak usage for parking lots overall occurred between 11 am and 1 pm.

Parking Occupancy In Downtown Carrboro By Time of Day

Parking Occupancy In Downtown Carrboro By Time of Day

 

As you can see, the public parking spaces (the combined blue and red area) are more uniformly full, while the private spaces vary greatly. It’s also worth noting that the town leases or owns 715 parking spaces in total, and these counts never get above 500.  So our public parking system still has capacity at all times of day.

This second chart by VHB shows how much capacity is available in terms of public, leased, and private spaces.

Parking Utilization By Type

Parking Utilization By Type

 

Parking Availability Varies by Block and By Lot

VHB put together two helpful maps showing parking occupancy by block and by lot.  Here it is by block, with publicly owner or leased facilities emphasized. For example, the dark green rectangle to the right of the letters 300 E Main is the parking deck by Hickory Tavern/Hampton Inn. It’s clear that parking, while still having capacity, is most scarce (up to 85% full) in the Carr Mill Mall section in the middle.

Downtown Carrboro Parking Utilization by Block

Downtown Carrboro Parking Utilization by Block

When you break parking availability down by lot, you see much wider variation in how full the lots are.

Downtown Carrboro Parking Supply By Lot- 11 am to 1 pm

Downtown Carrboro Parking Supply By Lot- 11 am to 1 pm

Still, three of the public lots, including those on Laurel and West Weaver St near PNC Bank, are close to half empty or have greater than 50% of their spaces available. Even the large lot just south of Open Eye Cafe shows at least 30% vacancy at lunch time. The small lots by Friendly Barber are tapped out, as is the lot by Carrburritos and Bowbarr on Rosemary. The parking deck also shows at least 30% vacancy.

What The Green Means – Opportunity

But look closely at the green lot in the middle towards the bottom, just a little bit below the “W” in the “E Weaver St” text. I’ve circled that lot in PURPLE. (click the image to make it bigger)

This is the Bank of America Lot. It has 25 regular spaces plus some for people with disabilities. What the parking study is telling us is that at the biggest crunch time for parking, a lunchtime rush hour, when a lot of people come to downtown Carrboro to eat at restaurants, with Tyler’s to the left of it, Acme to the right, there it is – stuck in the middle with at least 15 parking spaces free, ALL the time. The lot surely has signs saying “Parking for Customers only” so nobody parks there unless they’re going to the bank. But the bank clearly has far fewer customers coming by car than their lot can accommodate. In fact, VHB’s analysis tells us that Bank of America could keep the ten parking spaces closest to their door for themselves, and rent out the other 15 for public use- and not ever have a customer come to the bank and not be able to park for free in one of those ten spaces.

So why doesn’t this happen? Simply put, there’s not a system to buy into. This problem is too big for any one business in town to tackle on its own, but if the town set up the infrastructure and technology to make it EASY for Bank of America to release its parking spaces, the barrier for the bank to become a partner would be greatly reduced.  What would such a system look like? It would look something like the system Asheville already has for its public spaces, but would allow businesses to opt in for some portions of their parking lots. I’d call it “CarrPark.” If the town set up a system like the one in the link for its public and leased lots, then opened up invites to businesses, then lots like the Bank of America who clearly have capacity could be invited to join, and even get some revenue for renting their spaces. If Bank of America wanted to be cautious, they could only decide to lease ten spaces to the CarrPark pool at first. That means the public supply would go from 715 to 725. If it worked well, and Bank of America customers were still happy, the bank could consider moving to 15 spaces, and the public supply would go from 725 to 730. See how this works? Incrementally, without having to worry about giving up ALL their parking, business owners could expand the general parking pool, making everyone feel LESS of a parking crunch.

How to Price a “CarrPark” System

Best practices suggest that if you set the price of parking lots to to the lowest price possible that keeps them 85% full, but no more- then people find parking to be easy and convenient. If a parking lot in the CarrPark system is less than 85% full at any time, it’s free! When demand goes up, though- the price rises to help keep the lot convenient. Revenue from the system would cover the cost of operations and provide some revenue to business owners for each space they share as an incentive to participate. Revenue beyond the incentive would be used to fund other access improvements to downtown such as better evening transit service and bike/ped access projects.

Carrboro Parking Meeting June 16th: 5:30 – 7:30 PM, Town Hall

The next meeting on the Carrboro Parking Study will be Thursday, June 16th, at 5:30 PM at Town Hall, and the agenda includes future parking management strategies. I hope to see something like the CarrPark system presented as one of the options. Please attend if you can!

Tell the Aldermen: Carrboro Needs The Homestead-Chapel Hill High School Multi-Use Path

mup-typical-sectionThe town of Carrboro has been working steadily for seven years to plan for the Homestead-Chapel Hill High School Multi-Use Path. The greenway would provide a safe way for hundreds of children to walk or bike to not one, not two, but  THREE(!) different schools (Chapel Hill High, Smith Middle, Seawell Elementary)  from the Claremont, Winmore and even Lake Hogan Farms neighborhoods. For so many reasons, which I will detail below, it needs to be built, and Carrboro residents need to let the aldermen know this is the case. You can email the Carrboro Board of Aldermen by clicking this link, right now.

The Recent Controversy

Up until last week, work crews were likely to break ground for construction of the Homestead-Chapel Hill High School Multi-Use Path on May 16, 2016, or soon thereafter. Concerns about impacts to the Chapel Hill High Cross-Country (X-C) trail led to lots of complaints to the Carrboro Board of Aldermen. I’m not going to recap the controversy any further, but here is a report from WCHL.

Benefits of the Homestead-Chapel Hill High Multi-Use Path

There are several benefits the construction of this greenway offers to the community:

  • A direct, safe route to multiple schools from neighborhoods that have almost 1,000 children who otherwise must cross a dangerous road with 40-45 mph traffic to get to school by bike or on foot today. (The 2014 American Community Survey reports nearly 500 children aged 6 to 11 and over 450 children aged 12 to 17 live in Census Block Group 1, Census Tract 112.02, just north of Homestead Rd)
  • Students can use it for daily transportation, and when they do, they get to hear birdsongs projecting from the canopy and the rustle of rodents on the forest floor, sensory experiences that are blocked by an enclosed automobile or a noisy bus.  When they do, they get to be surrounded by trees rather than motor vehicles zooming by at speeds in excess of 35 or 40 mph.  They get to pass under that road, hearing the rush of the creek, rather than nervously crossing at grade with a wary eye toward aggressive turning movements of hurried parent chauffeurs.  They get to have daily fresh air and exercise as part of their trip.
  • A route for joggers, roller skaters, moms and dads pushing strollers, and people in wheelchairs.
  • A zero-emissions transportation option in an area where the barriers to such options are high.
  • Access to the natural beauty of Bolin Creek and the surrounding forest, including access for community members with disabilities who can’t physically go there today.

 

This is Not  a “New” or “Surprise” Project- The Planning for This Greenway Has Been Going On For Years, With CBOA Oversight

  • After a Greenways Commission recommendation, the Board adopted the Concept Plan on December 8, 2009 (Supported by current CBOA members Gist, Haven-O’Donnell, Lavelle & Slade, votes on page 11 of 14) Dec-2009-CBOA-Meeting-Minutes(PDF)
  • Former Carrboro Transportation Planner Jeff Brubaker, who spent hundreds of hours working on this project up through 2014, stated today:
  •  This direction was included in the adopting resolution: “Adopt the recommendation for Phase 1A and 1B (1B would not extend any further south than Jolly Branch), and Phase 2.” To follow the Board’s direction to stay north of Jolly Branch, the preferred route came to resemble what is shown as Alternative Route 3 (the “green route”) on p. 71 of the Concept Plan (Concept-Plan-BCG-Phase1b).  The merits of the green route were much discussed at Greenways Commission and Board of Aldermen meetings.  The route of the Homestead-CHHS Path closely resembles it, and so it has already gone through significant public vetting.

  • The CBOA unanimously approved an agreement with NCDOT to design the greenway on March 1, 2011. (Supported by current CBOA members Gist, Haven-O’Donnell, Lavelle & Slade, votes on page 3 of 14)  March-1-2011-CBOA-Meeting-Minutes (PDF)
  • On June 9, 2015, in a motion made by Alderman Gist and seconded by Alderman Haven-O’Donnell, the CBOA authorized the Town Manager to sign a contract for Construction, Engineering and Inspection services to build the greenway. It passed 6-0 with all current board members in favor save Alderman Slade, who was absent. Minutes-CBOA-June-9-2015 (PDF)
  • On November 24, 2015, all board members attending the meeting voted together to approve a contract amendment for the project. (PDF) Minutes-CBOA-November-24-2015

 

The Price of Changing Projects at The Eleventh Hour

One of the challenges of transportation projects is that they take time- land must be assembled, engineering work and environmental work must be done, and then finally, construction drawings of a greenway like this one are ready. If you want to make changes to a project, the later you make them, the more expensive it is to make a change, and the harder it is to introduce a change without unraveling much of the work you have already completed because the engineers need to tear up some of their drawings and start over, and then depending on the extent of the changes, all the environmental work must also be redone.

For a project seven years in the making, delaying another year, or frankly, even three to six months –  is simply unacceptable. Asking all the people who participated in prior public meetings, sat in Greenway Commission and CBOA meetings to discuss this project over those seven years, to wait further (or maybe forever) because of concerns brought forward when construction was about to begin, is to say that all the planning that came before matters little in the face of late-breaking complaints. This is a terrible way to make decisions.

Unless the Aldermen want to turn those seven years of public dialogue into a complete waste of time and call into question the validity of all other future public processes the town hosts, the construction of this game-changing project for people who walk and bike needs to get moving.

What The Carrboro Board of Aldermen Should Do

Given how close this project is to being able to be built, and to respect the time put in by ALL citizens who contributed to the development of this project, over the past seven years, and not just those expressing their concerns for the first time in these past few weeks, the first and primary option for the Carrboro Board of Aldermen to resolve the controversy should be to see if the cross-country trail can be modified as part of the construction process to eliminate the two crossings south of the westernmost tennis court.

If this cannot be accomplished without also adjusting the greenway design, the town of Carrboro and its taxpayers will certainly incur costs in time and money- the only uncertainty is how much. These costs should be minimized, and Chapel Hill High School should be asked to contribute to the cost of any changes.

The second and less desirable option is to come up with a design that minimizes impact to schedule and budget for the greenway while adjusting both the greenway and the cross-country trails slightly to eliminate two crossings.  It probably looks something like this, where the blue dotted line would be the modified greenway path, and the pink dotted line would be the modified X-C trail. Engineers working for the town would get input from the cross-country coach about appropriate guidelines for the turn in the pink section, and follow best practices used along the remainder of the greenway design up until this point to provide the best geometry for bicycling given a slightly more northern passage. Working within a narrow portion of the already design project to explore solutions that meet the town’s goals and the cross-country team’s goals gives us the best chance to get a win-win without a massive hit to project cost and time loss to completion. (click to enlarge):

There is a proposal on the Facebook page of the Friends of Bolin Creek organization that suggests abandoning roughly half of the design and re-routing the trail towards the north side of the tennis courts, and it should not be considered as a way forward. This is one of those late-breaking changes that is likely to cost a lot more than either of the approaches discussed above, simply because a path so different from what has already been drawn up would contain significantly more re-work on the engineering side. Pursuing this approach is more likely to indefinitely delay the greenway or render it fiscally infeasible, which would be a tremendous failure on the town’s behalf.

In Closing: Carrboro Needs the Homestead-Chapel Hill High School Multi-Use Path

In a world where we hear daily about the challenge of climate change, see data showing rising childhood obesity, struggle with equity issues, and parents worry about “nature deficit disorder,” the Homestead-Chapel Hill High School Multi-Use Path is the rare public investment that can address four such issues at once. Kids get more exercise on their way to school, walking or riding through nature instead of being strapped into a five-point harness in the back of a car. More facilities like this one mean more trips that are emission-free, promoting public health through not only pollution prevented, but also through increased physical activity. Finally, there are lots of people with mobility impairments for whom a multi-use path allows an exploration of nature that a dirt or gravel surface will simply not allow.

Carrboro has made this greenway a priority since 2009, and a majority of the board have cast several votes in favor of it in response to citizen recommendations over the past seven years. It’s time to build this excellent facility. You can let the Carrboro Board of Aldermen know you agree by emailing them when you click this link.

Thanks for reading!

GoTriangle Proposes Carrboro-Durham Bus Service, Additional Fast Trips from Chapel Hill

Triangle Transit BusesCarrboro residents who work at Duke or in Downtown Durham may soon have a new transportation choice: direct regional bus service on GoTriangle Route 405. Chapel Hill residents who work in the same places could see more fast trips this fall as well if GoTriangle implements the service proposal that is now out for public comment.

What Regional Bus Service Is Available Today Between Chapel Hill and Durham?

Currently, there are two regional bus routes operated by GoTriangle that link the Carolina Coffee Shop/Varsity Theater in Chapel Hill to Duke Hospital and Durham Station in Durham:

  • Route 405, which is faster and runs during peak hours only, departures every 30 minutes
  • Route 400, which covers more territory and takes 15 minutes longer than 405 to make the same trip, departures every 30 minutes

In the middle of the day, only Route 400 runs and the buses come once every 60 minutes. But there’s another quirk to the existing service- since the 400 takes an extra 15 minutes to make its trip, often times the 400 and 405 leave Chapel Hill at the exact same time, which means while there are 4 buses departing per hour, travelers only have two departure choices for the fast bus (405) since they often leave the Carolina Coffee Shop stop at the same time as the slower bus 400.

The New 405/400 Proposal: More Fast Buses Throughout the Day

There are several things to like about the proposal on the table for August of 2016:

  • The proposal shortens Route 400 by ten minutes (10 minutes!) by removing service from portions of Old Chapel Hill and Southwest Durham Drive. This makes Durham and Chapel Hill closer by bus, all day long.
  • The adjustment above allows buses to depart on more regular intervals (roughly 15 minutes) from downtown Chapel Hill, providing four departure choices every morning and afternoon during rush hour instead of two departure choices.
  • Service is extended into Carrboro, allowing for direct access to Durham from the Abbey Court/Collins Crossings stop, as well as downtown Carrboro. Durham residents who work in Carrboro can ride it to work, too.
  • Service in the middle of the day, AND on Saturday on Route 400 will now run every 30 minutes instead of every 60 minutes

Here is a map of the new service concept:

Proposed Carrboro-Durham Bus Service

Proposed Carrboro-Durham Bus Service

 

GoTriangle Now Accepting Public Comments

GoTriangle is accepting public comments on this proposal until April 28, 2016.

To find out additional details about the proposal and to share your opinion, please visit GoTriangle’s Service Change Survey for Route 400/405 here.

Carrboro has had one of the highest percentages of residents using public transportation in North Carolina and the southeast for many years. I expect this service to be well-used by many residents and workers alike. If having this service come to Carrboro is important to you, please take the time to share your comments at the link just above.